Engineering & Construction Building local business infrastructure with Business Parks in Côte d'Ivoire
The services rendered by Alliad in these projects include General Project Management Services, Pre-Construction Services and Construction Services.
Design and construction of 6 pre-engineered warehouses plus ancillary office buildings since 2018 across 3 phases.
Phase 1:
- PEB Warehouses of 9,464m2 and 8,551m2. Front office building and concrete pavement for parking
Phase 2:
- 2 x PEB Warehouses of 4,136m2 and 5,060m2
Phase 3:
- 2 x PEB Warehouses with areas 11,328m2 and 10,421m2
Services
Design, Construction, Project Management
Client
Agility Business Parks Cote D’Ivoire SARL
Year
2018- ongoing
Location
Abidjan, Côte d'Ivoire
In this 3-phased ongoing project Alliad has performed General Project Management Services, Pre-Construction Services and Construction Services.
Total warehousing space
Phase project
Details of case
- Earthworks
- Concrete and blockworks
- Supply and erection of Pre-Engineered Building Warehouse
- Building works; steel framing, wall and roof covering, provision of doors and windows, flooring and tiling
- MEP works (including external)
- Electrical works
- Security system; access control and data network installation
- Firefighting network; fire hydrants, pipes, fittings and hardware
- Fire alarm and detection system; detectors, sounders, manual call point and control panel
- External/Ancillary works